Home ProductsHammer Piling Machine

7T Hammer Piling Machine / Concrete Pile Driving Low Fuel Consumption

Certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
I'm Online Chat Now

7T Hammer Piling Machine / Concrete Pile Driving Low Fuel Consumption

7T Hammer Piling Machine / Concrete Pile Driving Low Fuel Consumption
7T Hammer Piling Machine / Concrete Pile Driving Low Fuel Consumption 7T Hammer Piling Machine / Concrete Pile Driving Low Fuel Consumption

Large Image :  7T Hammer Piling Machine / Concrete Pile Driving Low Fuel Consumption

Product Details:
Place of Origin: Hunan, China (Mainland)
Brand Name: T-WORKS
Certification: CE / SGS / ISO9001
Model Number: 7T
Payment & Shipping Terms:
Minimum Order Quantity: 1 SET
Price: Negotiable
Packaging Details: Main machine nude packed but key parts packed by plastic paper & tape and sealed with grease.
Delivery Time: 30days after contract signed
Payment Terms: L/C, T/T, Western Union
Supply Ability: 30 Set/Sets per Month Piling rig
Detailed Product Description
Condition: New Efficiency: 98%
Movement Type: Crawler Type Or Walking Type Engineering Machine: A Pile Driving Machine By Hydraulic
After-sale Service: Engineer Available Any Time
High Light:

pile hammer equipment

,

drop hammer pile driving

7T pile driver hammer and hydraulic impact hammer for piling of concrete pile or tubes

 

1. Product description

1. High blow rate and remote control system are effective for fast and accuracy driving.

2. Hydraulic and electrical components are imported to ensure the quality

3. Ram slide can be changed easily by the special design

 

 

SPECIFICATIONS FOR 25 TON CRAWLER EXCAVATOR
Max energy of blow
Kn.m
60
Max stroke of blow
mm
1200
Min stroke of blow
mm
200
Weight of hammer core
kgs
5000
Blow frequency
times
20--60
Pump set
model
2*A7V78
Max oil pressure
Mpa
23
Weight of complete set
KGS
9250
Total height
mm
6560
Suitable piles(square pile or round pile or pipe)
mm
300-400

 

 

 

2. Main Features

1) Simple structure in linear type ,easy in installation and maintation.

 

2) Adopting advanced world famous brand components in pneumatic parts ,electric parts and operation        parts.

 

3) High pressure double crank to control the die opening and closing.

 

4) Running in a high automatization and intellectualization,no pollution

 

5) Apply a linker to connect with the air conveyor ,which can directly inline with filling machine .

 

 

 

3. Our Service
 
 -  Pre-Sales Service
 

 * Inquiry and consulting support.

 

 * Sample testing support.

 

 

 

 * View our Factory.

 - After-Sales Service

 * Training how to instal the machine, training how to use the machine.

 

 * Engineers available to service machinery overseas.

 

 

 

 

4. Packing & Delivery
 
7T Hammer Piling Machine / Concrete Pile Driving Low Fuel Consumption 0
 
 
Packaging
Size
6250mm*1800mm*1200mm
Weight
9250mm
 
 
 
Packaging Details
The normal package is plastic package. If container is too tigher,we will use pe film for packing or pack it according to customers special request.
 

Contact Details
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Contact Person: Ivy

Tel: +8615084873766

Send your inquiry directly to us (0 / 3000)