Home ProductsHydraulic Piling Machine

Concrete Pile Foundation Hydraulic Jack Machine Instead Of Hammer

Certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
I'm Online Chat Now

Concrete Pile Foundation Hydraulic Jack Machine Instead Of Hammer

Concrete Pile Foundation Hydraulic Jack Machine Instead Of Hammer
Concrete Pile Foundation Hydraulic Jack Machine Instead Of Hammer Concrete Pile Foundation Hydraulic Jack Machine Instead Of Hammer

Large Image :  Concrete Pile Foundation Hydraulic Jack Machine Instead Of Hammer

Product Details:
Place of Origin: HUNAN,CHINA
Brand Name: T-WORKS
Certification: CE,GOST
Model Number: ZYC240B-B1
Payment & Shipping Terms:
Minimum Order Quantity: 1 unit
Price: Negotiable
Packaging Details: Nude package by bulk vessel
Delivery Time: 30-45 days
Payment Terms: L/C, T/T, D/P, Western Union
Supply Ability: 10 units per month
Detailed Product Description
Product Name: Hydraulic Piling Machine Rated Piling Pressure: 2400KN
Piling Stroke: 1.9m Piling Speed: 7.7m/min
Crane Lifting Capacity: 12 Ton Lifting Pile's Length: 14m
Max Square Pile: 500mm Max Circle Pile: 500mm
High Light:

hydraulic pile driving machine

,

construction piling machine

 

T-WORKS ZYC Series 240T Hydraulic Piling Machine For Concrete Pile foundation Instead Of Hammer With No Air Pollution

 

1.  Description:

 

Hydraulic Static Pile Drivers are featured with no noise, no vibration, no pollution and no rubbish left in construction site.It can work with H-piles, precast concrete and steel piles with different shapes,like round,square and tapered shape. There are series models range from 80T to 1200T

 

It is adopted the hydraulic system design of large power and high flow,the precast pile entirely depends on the hydraulic static pressure so that the pile can be pressed into the ground steadily and quietly.

 

The pressing-pile speed amounting to 300-800 meters within 8hours, which its quite more efficient than other conventional pile drivers.

This unique construction method with non-pollution has gradually taken place of the pile hammer.

 

2.  Applications:

 

  • Clay, soft soil, sand layer, etc.
  • Noise regulated urban area.
  • Vibration regulated areas where traditional methods may threaten the stability of existing structures.

 

3. Specifications:

 

Item Model/size Item Model/size
Main pushing cylinder 180/125-1900 Pushing stroke 1.9m
Assistant pushing cylinder 180/125-1900 Pushing stroke 1.9m
Supporting leg cylinder 220/160-1600 Stroke for outrigger cylinder 1.6m
Long boat cylinder 125/90-2400 Stroke for long boat 2.4m
Short boat cylinder 125/90-600 Stroke for short boat 0.6m
Clamping cylinder 250/180-30 Clamping box 8cylinders type
Crane capacity 12Ton X 14 meters Pumps for pile pushing 2 * A7V78
Side jacking mechanism Standard type Engine motor for pile pushing 2* 30KW
Main working pressure 24Mpa Pumps for crane 1 * 63YCY
Piling speed 7.7m/min Engine motor for crane 1 * 30W
Max spun pile 500mm Max square pile 500mm
Min working size 11.1m x 5.8m Min weight for main body 28ton
Weight of main machine 90tons Counterweight needed 150tons
Total capacity 240Ton

 

4.  Features of Hydraulic static pile driver:

 

  • Unique design of clamping mechanism for each jaw to be adjusted with the shaft bearing surface to ensure the largest contact area with the pile,avoid damaging the pile.
  • Unique design of side/corner piling structure, improves the capacity of side/corner piling,the pressure force of side/corner piling up to 60%-70% of main piling. The performance is much better than hanging side/corner piling system.
  • Unique clamping pressure-keeping system can automatically fill in the fuel if the cylinder leak oil,ensuring high reliability of clamping pile and high quality of construction.
  • Unique terminal pressure-stabilized system ensures no float to the machine at rated pressure,greatly improving the safety of operation.
  • Unique walking mechanisim with lubrication cup design could realize durable lubrication so as to extend serivice life of rail wheel.
  • Constant & high flow power hydraulic system design ensures high piling efficiency.

 

Concrete Pile Foundation Hydraulic Jack Machine Instead Of Hammer 0

 

Contact Details
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Contact Person: liulan

Tel: +8618570651536

Send your inquiry directly to us (0 / 3000)