Home ProductsPile Foundation Equipment

600T Foundation Drilling Equipment With Lifting Crane No Air Pollution

Certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
I'm Online Chat Now

600T Foundation Drilling Equipment With Lifting Crane No Air Pollution

600T Foundation Drilling Equipment With Lifting Crane No Air Pollution
600T Foundation Drilling Equipment With Lifting Crane No Air Pollution 600T Foundation Drilling Equipment With Lifting Crane No Air Pollution

Large Image :  600T Foundation Drilling Equipment With Lifting Crane No Air Pollution

Product Details:
Place of Origin: HUNAN, CHINA
Brand Name: T-WORKS
Certification: ISO9001/SGS / GOST/CE
Model Number: ZYC600B-B1
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Nude packing for main body, plastic package for main parts
Delivery Time: 30days after deposit received
Payment Terms: L/C, T/T, Western Union
Supply Ability: 20 sets per month
Detailed Product Description
Product Name: Pile Foundation Equipment Suitable Pile Size: Max 800 Mm For Round, 650mm For Squre
Piling Speed(m/min): 7.9 Dimension(L*W*H): 13.8m*8.12m*3.3m
Crane Mounted: 20T Lifting Capacity Available For Customers Efficiency: 98%
High Light:

pile foundation machine

,

foundation construction equipment

Fast Speed High Quality 600T Pile Foundation Equipment With Lifting Crane                      

 

1.  Description:

We are able to produce nearly 40 ZYC models of Static pile drivers from 60 tons to 1200 tons at the customers' own choice,or make a new model according to the customers' requirement.
Each tonnage is classified into the following three models:

With the function of side piling and corner piling
Without the function of side piling and corner piling
With a connecting system for adding side piling and/or corner piling mechanism if necessary.

600T Foundation Drilling Equipment With Lifting Crane No Air Pollution 0

 

2. Applications:

 

  • Clay, soft soil, sand layer, etc.
  • Noise regulated urban area.
  • Vibration regulated areas where traditional methods may threaten the stability of existing structures.

3. Specifications:

Parameter/Model ZYC600
Rate piling pressure(KN) 6000
Piling speed(m/min) Fast 7.9
Low 1.4
Piling stroke(m) 1.9
Pace(m) Longitudinal 3.6
Horizontal 0.7
Angle range(°) 11
Rise stroke(m) 1.2
Square pile(mm) Max 650
Circle pile(mm) Max 800
Side piling space(mm) 1380
Corner piling space(mm) 2800
Lifting weight(t) 20
Pile hanging length(m) 16
Power(KW) Piling 111
Lifting 30
Main dimension(m) Work length 13.8
Work width 8.12
Transportation height 3.3
Total weight(t) 600

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. Feature Advantage:

1). Civilized construction; Clean; No noise; No vibrations; No construction wastes.
2). Reliable Construction Quality; Piling process is similar to static load testing, where pile bearing force can be displayed. 100% pile success rate is guaranteed.
3). Fast piling and High efficiency; One Hydraulic Static Pile Driver (shortened as HSPD )can drive piles in total of 600~800m per 8 hours, much faster than other modes. Especially suitable for large-scale or time-constraint projects.
4). Walking and steering freely. Easy to align piles.
5). Compact conformation. Easy to disassemble & assemble.

600T Foundation Drilling Equipment With Lifting Crane No Air Pollution 1

600T Foundation Drilling Equipment With Lifting Crane No Air Pollution 2

 

Contact Details
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Contact Person: Dan

Tel: +8618100731614

Send your inquiry directly to us (0 / 3000)