Home ProductsScrew Pile Machine

High Efficiency Screw Pile Machine Crawler Or Step Walking Movement Way

Certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
I'm Online Chat Now

High Efficiency Screw Pile Machine Crawler Or Step Walking Movement Way

High Efficiency Screw Pile Machine Crawler Or Step Walking Movement Way
High Efficiency Screw Pile Machine Crawler Or Step Walking Movement Way High Efficiency Screw Pile Machine Crawler Or Step Walking Movement Way

Large Image :  High Efficiency Screw Pile Machine Crawler Or Step Walking Movement Way

Product Details:
Place of Origin: Hunan, China
Brand Name: T-works
Certification: ISO9001
Model Number: KLB26-800
Payment & Shipping Terms:
Minimum Order Quantity: 1 unit
Price: Negotiable
Packaging Details: Nude package for main body, plastic packages for key parts
Delivery Time: 40days
Payment Terms: L/C, T/T, Western Union, D/A
Supply Ability: 15units per month
Detailed Product Description
Product Name: Bored Pile Rig Color: Available
Max Depth: 26meters Max Diameter: 800mm
Movement Way: Crawler Or Step Walking After Sale Service: Engineer Available Any Time
Quality Gurantee: 12months For Structure,6 Months For Parts
High Light:

screw pile driver

,

bore pile machine

New screw piling machine for screw bored pile of drilling with max depth 34meters and diameter 1m

 

 

 

1. Products description

 

- Compsed by : Pulley group, colomn, inclined support leader, movement mechanism, rotary mechanism, winch complete set,  operation cabin, hydraulic system , electrical system.

 

- KL series drilling rig is a kind of piling machinery for bored pile or screw pile with auger drill.

 

- The max drilling depth could reach 34m. A wild range of products could be chosen for your practical needs.

 

- Movement way: crawler or step walking. 

 

- Lower cost and easy operation , high working effciency.

 

 

 

2. Application:

 

-  Bridge foundation construction 

 

-  Real estate bored pile construction

 

-  hard layer bored pile foundation job,like decayed rock

 

 

 

3. Working processes:

 

-  Firstly, drilling hole to target depth

 

-  Secondly, inspect the hole quality, check the diameter and depth

 

-  Thirdly,  Clean the soil in the bottom of hole

 

-  Forth, Put the steel case down to the hole

 

-  Fifth, put the mixing concrete inside of the steel case 

 

High Efficiency Screw Pile Machine Crawler Or Step Walking Movement Way 0

 

 

4.Technical parameter for KLB26-800 for  bored drilling rig:

 

KLB WALKING TYPE KLB26-800
Walking way Electro-hydraulic step
Max drilling depth 20m
Max drilling diameter ¢800mm
Max output torque 36KN.m
Rod rotated speed 20r/min
Allowed lifting force 240KN
Power of power head 45KW*2
Reductor of power head ZZSH430
Colomn size rectangle section
Colomn depth 30.5m
Colomn oriented center distance 600*¢102
Colomn inclined range front inclination 5°
back inclination 3°
Walking stroke 1.5m
Climbing ability of pile frame
Rotary Rotary way rotary motor
Rotary angle ≤360°
Rotary speed 0.25r/min
Main winch Single pulling force 5T
Motor power 22KW
Increasing speed 2.0/2.6/3.2
Vice winch Single pulling force 1.5T
Motor power 7.5KW
Increasing speed 20m/min
Overall dimension(L*W) 10m*5.2m
Total weight(T) 63

 

 

 

5.   After sale service and quality gurantee

 

1) Always be ready to answer technical questions concerned from our customers.
 
2) Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.
 
3) To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.
 
4) Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.


5) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.

 

 

 

High Efficiency Screw Pile Machine Crawler Or Step Walking Movement Way 1

 

 

 

 

Contact Details
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Contact Person: Ivy

Tel: +8615084873766

Send your inquiry directly to us (0 / 3000)