Home ProductsPile Foundation Equipment

Hydraulic Foundation Digging Machine 7.7m/Min Piling Speed Energy Saving

Certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
I'm Online Chat Now

Hydraulic Foundation Digging Machine 7.7m/Min Piling Speed Energy Saving

Hydraulic Foundation Digging Machine 7.7m/Min Piling Speed Energy Saving
Hydraulic Foundation Digging Machine 7.7m/Min Piling Speed Energy Saving Hydraulic Foundation Digging Machine 7.7m/Min Piling Speed Energy Saving

Large Image :  Hydraulic Foundation Digging Machine 7.7m/Min Piling Speed Energy Saving

Product Details:
Place of Origin: HUNAN,CHINA
Brand Name: T-works
Certification: CE,GOST
Model Number: ZYC280
Payment & Shipping Terms:
Minimum Order Quantity: 1 unit
Price: Negotiable
Packaging Details: Nude package by bulk vessel
Delivery Time: 30-45 days
Payment Terms: L/C, T/T, D/P, Western Union
Supply Ability: 10 units per month
Detailed Product Description
Product Name: Hydraulic Static Pile Driver Max Driving Force: 2800KN
Rated Piling Pressure: 2800KN Piling Stroke: 1.8m
Piling Speed: 7.7m/min Total Weight: With Counterweight Total 280Ton
High Light:

pile foundation machine

,

foundation construction equipment

T-works Pile Foundation Equipment for Spun and Square Pile foundation

 

1,  Description:

ZYC series hydraulic static pile driver is a new environmentally friendly pile foundation construction equipment with a number of national patents. It has the features of no pollution, no noise, no vibration, and fast pile driving, high quality pile. It is represent the future development tendency of pilling machinery.

 

2,  Applications:

 

  • Clay, soft soil, sand layer, etc.
  • Noise regulated urban area.
  • Vibration regulated areas where traditional methods may threaten the stability of existing structures.
  •  

3,  Specifications:

 

Parameter/Model ZYC280
Rate piling pressure(KN) 2800
Piling speed(m/min) Fast 7.7
Low 1.8
Piling stroke(m) 1.9
Pace(m) Longitudinal 2.4
Horizontal 0.6
Angle range(°) 15
Rise stroke(m) 1.0
Square pile(mm) Max 500
Circle pile(mm) Max 500
Side piling(mm) 900
Corner piling space(mm) 1800
Lifting weight(t) 12
Pile hanging length(m) 14
Power(KW) Piling 60
Lifting 30
Main dimension(m) Work length 12
Work width 6.1
Transpot height 3.1
Total weight(t) 280

 

 

4, Feature Advantage:

 

 

  • Civilized construction and clean field, no noise, vibration, sewage or smoke, suitable for local area operation with special environmental requirements.

 

  • Rapid pressing speed with high efficiency, the pile can be pressed for 400-600m in a machine shift (8 hours) which is much higher than other pile machinery, so the driver is the most efficient equipment for large-scale foundation construction with urgent time limit.

 

  • Theoretically the total length of pile is unlimited as long as in the permitted range of intensity and stiffness.
  • The construction quality is stable and guaranteed. The pile accomplishing rate is easy to be 100% because of the pile pressing process similar to pile testing.

 

  • In all pile foundation constructions, the expense is one of the least according to the bearing capacity of precast pile per cubic meter.

Hydraulic Foundation Digging Machine 7.7m/Min Piling Speed Energy Saving 0

Contact Details
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Contact Person: Ruby

Tel: +8618807488806

Send your inquiry directly to us (0 / 3000)