Home ProductsPile Foundation Equipment

No Vibration Pile Foundation Equipment , Foundation Drilling Machine

Certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
I'm Online Chat Now

No Vibration Pile Foundation Equipment , Foundation Drilling Machine

No Vibration Pile Foundation Equipment , Foundation Drilling Machine
No Vibration Pile Foundation Equipment , Foundation Drilling Machine No Vibration Pile Foundation Equipment , Foundation Drilling Machine

Large Image :  No Vibration Pile Foundation Equipment , Foundation Drilling Machine

Product Details:
Place of Origin: Hunan, China
Brand Name: T-WORKS
Certification: ISO9001,GOAST,CE
Model Number: ZYC800B-B1
Payment & Shipping Terms:
Minimum Order Quantity: 1 unit
Price: Negotiable
Packaging Details: Nude package for main body, plastic package for key parts
Delivery Time: 30days
Payment Terms: L/C, D/A, T/T, Western Union
Detailed Product Description
Delivery Time: 30days After Deposit Received After-sale Service: Engineer Available Any Time
Color: Customized Quality Gurantee: 1 Year For Structure
Crane: 25T Lifting Pile's Length: 17m
High Light:

foundation construction equipment

,

foundation drilling machine

 

T-WORKS ZYC Series 800Ton Pile Foundation Equipment For The Precast Concrete Pile With Noise Free And No Vibration

 

1. Product description :

 

The traditional driving  of precast piles still dominates the world, partly supported by the high reliability of both the pile as well as the input method.

 

However,because of regulations and environmental issues the various methods that form the piles in the ground also become more popular. Yet, these methods do not provide the same high quality pile as the precast foundation pile.

 

Pushing instead of driving the high quality precast concrete piles unites the advantages of the piles with those of pushing. Noise is reduced to a minimum and no vibrations are caused. In partucular in urban areas this is favorable.

 

In Asia this method has been successfully used for over a decade. T-works as a professional manufacturer for jack in machine is always keeping impoving the design to meet the customers' actual requirement.

 

The series of hydraulic pile driver machine capacity is from 80ton to 1200ton , but we also can do smaller model like 60ton.  The pile it can drive is from 150mm to 800mm for precast concretespun pile, 150mm to 650mm for square pile . H-pile, triangle pile, tube are also suitable by changing the jaws of the machine.

 

2. Application: 

 

   1)  Clay, soft soil, sand layer ,etc

 

   2)  Noise regulated area

 

   3)  Vibration regulated areas, such as near buildings, precision instrument buildings, subway, overpass and so on.

 

3. Specification of the ZYC800 hydraulic pile foundtion  machine:

 

Item Model/size Item Model/size
Main pushing cylinder 250/180-1900 Pushing stroke 1.9m
Assistant pushing cylinder 280/220-1900 Pushing stroke 1.9m
Supporting leg cylinder 380/250-1100 Stroke for outrigger cylinder 1.1m
Long boat cylinder 200/125-3600 Stroke for long boat 3.6m
Short boat cylinder 200/125-700 Stroke for short boat 0.7m
Clamping cylinder 380/250-50 Clamping box 8cylinders type
Crane capacity 25Ton X 17 meters Pumps for pile pushing 3 * A7V107
Side jacking mechanism Standard type Engine motor for pile pushing 3* 37KW
Main working pressure 24Mpa Pumps for crane 1 * 107
Piling speed 7.2 m/min Engine motor for crane 1 * 37W
Max spun pile 800mm Max square pile 650mm
Min working size 14.7m x 8.52m Min weight for main body 55ton
Weight of main machine 190tons Counterweight needed 610tons
Total capacity 800Ton

 

 

4. Features advantages :

 

1)   Patents support the technical and keep improving all the times

 

With  keeping moving thought inside of all T-works' staffs, we always gather the detail requirements from our customers and know what they want according to the actual condition during working. The technical engineer will do improvment and make some new design to suit the actual needs, that is why we have  accumulated many patents .

 

No Vibration Pile Foundation Equipment , Foundation Drilling Machine 0

 

2)  Special side mechanism

 

Special side mechanism with separated pushing cylinder and clamping box , sharing the same clamps with center piling. The side distance to the wall is only 450mm, suitable for mini project in the narrow corner. It can reach half piling force of center. It can push the triangle pile, square pile, round pile, H- pile, and other shapes.

 

No Vibration Pile Foundation Equipment , Foundation Drilling Machine 1

 

3)  Assembly and De- mobilization

 

After shipment, the machine has to be assembled using the instructions and maybe with help of our employees as usual , This takes one or two days, after which a trainning can be given in working with the hydraulic pile pusher. 

This is a special design for its legs which is automatical . It can walk onto the trailer freely by its walking mechanism. Also no need to dismantle them during transporation .

 

No Vibration Pile Foundation Equipment , Foundation Drilling Machine 2

 

4)  After sale service and quality gurantee

 

1) To train operating,maintenance and construction people for our customers.

 

2) Always be ready to answer technical questions concerned from our customers.
 
3)Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.
 
4)To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns. 
 
5)Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.

 

6) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.

 

No Vibration Pile Foundation Equipment , Foundation Drilling Machine 3

 

 

 

Contact Details
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Contact Person: liulan

Tel: +8618570651536

Send your inquiry directly to us (0 / 3000)