Home ProductsHydraulic Static Pile Driver

360T 11° Steering Hydraulic Piling Machine For Building Construction

Certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. certification
I'm Online Chat Now

360T 11° Steering Hydraulic Piling Machine For Building Construction

360T 11° Steering Hydraulic Piling Machine For Building Construction
360T 11° Steering Hydraulic Piling Machine For Building Construction 360T 11° Steering Hydraulic Piling Machine For Building Construction 360T 11° Steering Hydraulic Piling Machine For Building Construction

Large Image :  360T 11° Steering Hydraulic Piling Machine For Building Construction

Product Details:
Place of Origin: Hunan, China
Brand Name: T-WORKS
Certification: ISO9001/SGS / EAC/CE
Model Number: ZYC360
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Nude packing for main body, plastic package for main parts
Delivery Time: 30days after deposite received
Payment Terms: L/C, T/T, Western Union
Supply Ability: 15 units per month
Detailed Product Description
Product Name: Hydraulic Static Pile Driver Piling Speed(m/min): 7.8
Piling Stroke(m): 1.9 Steering Angle(°): 11
Sauitable Pile Size: Max 600mm For Round, 500mm For Suqare Efficiency: 98%
High Light:

11° Steering Hydraulic Piling Machine

,

3600KN Hydraulic Piling Machine

,

360T Hydraulic Static Pile Driver

360T Full Hydraulic Piling Machine For building construction Without Noise Vibration Pollution

 

1. Description:

ZYC series hydraulic static pile driver is a new environmentally friendly pile foundation construction equipment with a number of national patents. It has the features of no pollution, no noise, no vibration, and fast pile driving, high quality pile. It is represent the future development tendency of pilling machinery.

 

2. Applications:

  • Clay, soft soil, sand layer, etc.
  • Noise regulated urban area.
  • Vibration regulated areas where traditional methods may threaten the stability of existing structures.

3. Specifications:

Parameter/Model ZYC360
Rate piling pressure(KN) 3600
Piling speed(m/min) Fast 7.8
Low 1.9
Piling stroke(m) 1.9
Pace(m) Longitudinal 3.6
Horizontal 0.7
Angle range(°) 15
Rise stroke(m) 1.1
Square pile(mm) Max 500
Circle pile(mm) Max 600
Side piling space(mm) 1250
Corner piling space(mm) 2500
Lifting weight(t) 16
Pile hanging length(m) 16
Power(KW) Piling 74
Lifting 30
Main dimension(m) Work length 12.7
Work width 7.1
Transportation height 3.15
Total weight(t) 360

 

4. Feature Advantage:

  • The clamping box is processed as a whole, and the clamping jaws are processed by a boring machine to ensure the concentricity of the clamping box and jaws.

360T 11° Steering Hydraulic Piling Machine For Building Construction 0

 

  • Inverted cylinders as a supporting leg which allow it to withstand greater radial forces and greatly improve the service life of the cylinder.

360T 11° Steering Hydraulic Piling Machine For Building Construction 1

 

  • The overall design of the crane is more reasonable, with loger main boom and higher strength. In this way, the main boom generally doesn't tip and break.

360T 11° Steering Hydraulic Piling Machine For Building Construction 2

 

The advantages are more than these, and this machine will absolutely give you more surprises.

 

5. After sale service and quality gurantee

1) To train operating,maintenance and construction people for our customers.

2) Always be ready to answer technical questions concerned from our customers.
3) Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.
4) To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.
5) Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.
6) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.

360T 11° Steering Hydraulic Piling Machine For Building Construction 3

 

 

 

Contact Details
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Contact Person: Dan

Tel: +8618100731614

Send your inquiry directly to us (0 / 3000)